Torus Enerji İnşaat ve Madencilik A.Ş High Voltage Engineering Project

Torus Energy Difference in High Voltage Projects
Torus Energy is one of the leading companies in the sector with its 30 years of experience in high voltage projects. We offer solutions that comply with international standards in the design, installation and operation of high voltage systems. We work to provide our customers with reliable, high-quality and sustainable energy solutions.
Basic Steps in High Voltage Projects
1. Determination of Transformer Requirement: Transformer requirement in high voltage projects is determined according to the needs of the project. Whether the transformer requirement is necessary or not is analyzed by taking into account the energy need and technical details.
2. On-Site Exploration and Transformer Location Determination: A detailed exploration study is carried out in the project area. The most suitable location for transformer placement is determined. Environmental factors, safety measures and technical requirements are evaluated.
3. Projecting: High voltage systems are designed in accordance with the regulations. Transformer, switchgear and low voltage (LV) systems are designed. The project is brought into compliance with relevant standards and regulations.
4. Obtaining Connection Opinion: Connection opinions are obtained from relevant institutions for the approval of the project. The project file is reviewed by the institutions and the approval process is completed.
5. Implementation and Installation: All equipment and systems are installed in accordance with regulations. Transformers and cells are installed. Low voltage (LV) systems are commissioned.
6. Temporary Acceptance and Commissioning: The performance and reliability of the system are tested. The system is commissioned after the temporary acceptance procedures are completed.